• Water Scrubber

    The equipment is installed between the chemical purifier and the high-pressure compressor which helps to remove additional impurities from the gas if any.

  • Air Seperation Unit / Cold Box

    Air Seperation Unit / Cold Box consists of Distillation Column with Heat Exchangers for heat transfer between the incoming air and the out going cold Nitrogen and Oxygen. It is equipped with Expansion valves for controlling the operation of the plant. Control panel for the cold box is provided with the plant. Defrost heater for thawing plant is also provided on the cold box. It is also equipped with liquid oxygen pump which is a single cylinder equipment and delivers Bone-dry Oxygen upto pressure 165 Kg/Cm2. Cold box is insulated withperlite for minimizing cold losses and reducing power consumption.

  • Placeholder

    Acetylene Compressor

    For filling of the cylinders an I.R. make reciprocating, oil lubricated, multi-stage, water submerged compressor with intercoolers,safety relief valve for each stage, driven by a 15 H.P. Flame Proof Motor confirming to
    IS: 2148-68(Gr.II.B)isprovided.

  • Sanghi Water Softner Plant

    Custom built water softner plants with flow Capacities ranging from 0.7m3 / Hr to 12m3 / hr with an output per regneration ranging from 8.1m3 to 20.3m3 max. working pressure 3.0 kg / cm2.

  • Placeholder

    No Loss -Carbide charge

    No gas is lost or wasted while charging the carbide because that section is completely sealed off from the generator by a high pressure hydraulically operated valve.All the above controls are automatic and require no attention from the operator. There is a further safety device, in terms of an alarm bell, which will ring continuously till the fault is corrected.